system integration

Featured

Mistake 7 – Skipping end to end testing

When everything looked ready to go live, a quiet engine room revealed what was missed — proper end-to-end testing. Half the PAGA speakers were barely audible, and the failover system failed to switch during a power cut. The cause? Wiring, calibration, and configuration oversights that thorough testing would have caught. The lesson was clear: installation isn’t the finish line, testing is the victory lap.

Featured

Mistake 6 – Failure to test alarm priorities

Properly testing alarm priorities in a PAGA system is not optional—it’s essential for safety. Even a small wiring mix-up can cause alarms to sound incorrectly, masking real emergencies and putting lives at risk. By thoroughly checking connections and ensuring emergency messages override routine signals, engineers can guarantee the system performs reliably when it matters most.

× Enquire